Monday, 21 January 2008

Loxwood: Wey & Arun Canal




Work is in progress at the Onslow Arms pub to reconnect the two severed sections of the canal. The road level will not change. The lock on the west side of the A281 has been built to lock the boats down to a water level to pass through a tunnel under the existing level of the road surface.

No comments:

Post a Comment