Monday, 17 March 2008

Loxwood Wey & Arun Canal latest news


Half the road now excavated. Foundations and basic concrete pilings in for sides of tunnel.
The road is down to one lane with traffic light control.

1 comment:

  1. Hello. This post is likeable, and your blog is very interesting, congratulations :-). I will add in my blogroll =). If possible gives a last there on my blog, it is about the Monitor de LCD, I hope you enjoy. The address is http://monitor-de-lcd.blogspot.com. A hug.

    ReplyDelete